David led the design of the Temporary Truss for top-down construction of a deep station box, including correction of floor plates. The solution addressed extreme load paths and installation constraints and went on to win the BCIA Award for Temporary Works Initiative.
The design of the bank truss was inspired largely by earlier work on the repair of a major overseas infrastructure asset. Follow the link below to learn more.