We have good experience in the design of tower crane support grillages fixed to permanent works, including the verification and possible strengthening of the supporting structure.

This grillage at Paddington Crossrail originally had 4 legs of equal length. Two of the legs were subsequently shortened to allow the grillage to be repurposed in a different location on the same site for later construction stages.
The grillage was fixed to the supporting concrete structure using post tensioned through-bolts coordinated with existing reinforcement.
Email: info@aceng.co.uk
Phone (UK): +44 203 48 81018